The refurbishment and expansion of the Valpaços Hospital Unit was based on the need to create thermal comfort conditions and ensure indoor air quality, in a reliable, economical and ecological solution.
The work envisaged the total remodeling of the existing building and the construction of a new building adjacent to and connected to the existing building.
With the Arfit Solution, they have air treatment, recovery, ventilation, dehumidification and centralized technical management units.
This solution allows energy rationalization, adjusting the operation of the equipment to the real needs of the installation, optimizing its performance.
Related Projects